Hurry Offer Ends In
01 Days
:
19 Hours
:
03 Mins
:
47 Secs
Nuie Square L-Shaped Shower Bath 1700mm x 700mm/850mm - Left Handed (inc Leg Set) | Product Image Nuie Square L-Shaped Shower Bath 1700mm x 700mm/850mm - Left Handed (inc Leg Set) | Product Image Nuie Square L-Shaped Shower Bath 1700mm x 700mm/850mm - Left Handed (inc Leg Set) | Product Image Nuie Square L-Shaped Shower Bath 1700mm x 700mm/850mm - Left Handed (inc Leg Set) | Product Image Nuie Square L-Shaped Shower Bath 1700mm x 700mm/850mm - Left Handed (inc Leg Set) | Product Image Nuie Square L-Shaped Shower Bath 1700mm x 700mm/850mm - Left Handed (inc Leg Set)  | Dimension Image
Nuie Square L-Shaped Shower Bath 1700mm x 700mm/850mm - Left Handed (inc Leg Set) | Thumbnail Image Nuie Square L-Shaped Shower Bath 1700mm x 700mm/850mm - Left Handed (inc Leg Set) | Thumbnail Image Nuie Square L-Shaped Shower Bath 1700mm x 700mm/850mm - Left Handed (inc Leg Set) | Thumbnail Image Nuie Square L-Shaped Shower Bath 1700mm x 700mm/850mm - Left Handed (inc Leg Set) | Thumbnail Image Nuie Square L-Shaped Shower Bath 1700mm x 700mm/850mm - Left Handed (inc Leg Set) | Thumbnail Image Nuie Square L-Shaped Shower Bath 1700mm x 700mm/850mm - Left Handed (inc Leg Set)

Nuie Square L-Shaped Shower Bath 1700mm x 700mm/850mm - Left Handed (inc Leg Set)

Quick Code: 2675709
Ref: PMWBS1785L
Nuie | Brand Logo
£251.70 Inc. VAT

5% price drop on Nuie & Hudson Reed - extended until 30/06/26

Was: £264.95

PayPal Credit
Spread the cost with 12 monthly payments of £20.98 at 0% APR using PayPal.
Find out more
PayPal Credit

Bath Size:

Showering End:

In Stock

Usually delivered within 3 working days

Free Delivery Available

Delivery postcode restrictions apply

Check

Nuie L-Shaped Square Shower Bath - 1700mm x 850mm - Left Handed

Featuring a square design popular with modern interiors, the L-shaped shower bath makes the most of available space and provides an integrated showering and bathing area all-in-one. The bathing end of the tub measures 700mm, similar to a standard rectangular bath. The larger portion reaches 850mm width, giving additional room for showering without wasting valuable floor space.

The base price of the L-bath model is for the bathtub and leg set only. Compatible bath panels and bath shower screens are available separately.

Product Features

  • 1700mm x 850mm L-shaped square shower bath with a showering area up to 850mm wide
  • Left handed model - the showering area is on the left hand side when viewed from the front
  • Bathtub comes complete with leg set required for installation
  • 700mm wide at bath end; 850mm maximum width at showering end
  • Manufactured from 4mm thick acrylic
  • European White finish
  • Single ended design - waste and overflow positioned at the showering end of the tub
  • Supplied with no pre-drilled tap holes - allowing more flexibility when choosing taps/fillers
  • 5 year guarantee supplied by the manufacturer (see Guarantee Policy for more information)

Important Information

  • Bathtub and leg set only - bath panels, bath waste and taps sold separately
  • All product images show a 1700mm x 700mm/850mm model

Bath TypeShower Bath
Bath ShapeL-Shaped
ConfigurationSingle Ended
Bath ReinforcementStandard
Bath Length1700mm
Bath Width700-850mm
Bath Height400mm
Bath Total Height540mm
Bath Internal Length1175mm
Bath Internal Width469mm
Bath Thickness4mm
Capacity235 Litres
HandedLeft Handed
Waste PositionEnd
Outlet Connection Size52
Bath FeaturesIncludes Legs
MaterialAcrylic
ColourWhite
StyleModern
MarketDomestic
Bath Panel Included?No
BrandNuie
CollectionL-Shaped
EAN Barcode5056211822318
Manufacturer Part Number(s)WBS1785L

Panel Fixing Clip Instructions
Type : PDF Size : 222.96 KB
Fitting Instructions
Type : PDF Size : 165.75 KB
Guarantee Policy
Type : PDF Size : 319.11 KB
Bath Datasheet
Type : PDF Size : 3.27 MB
Brochure-26
Type : PDF Size : 43.73 MB

Required Bath Waste

Nuie Bath Waste and Overflow, Brass Plug and Ball Chain, Chrome
(HAE345)
£18.65
In Stock
Nuie Bath Pop Up Waste with Minimalist Overflow - Chrome
(HAE357)
£23.33 £31.30

Save £7.97 when purchased with the main item

In Stock

Required Bath Panels

Nuie L-Shaped Shower Bath Front Panel 500mm H x 1700mm W (2 Piece) - Acrylic
(PMWBS300N)
£55.12 £65.50

Save £10.38 when purchased with the main item

In Stock
Nuie Acrylic Square Bath End Panel 500mm H x 700mm W - White
(PMWBS301)
£56.05 £66.45

Save £10.40 when purchased with the main item

In Stock
Nuie Square Shower Bath Front Panel 520mm H x 1700mm W - Anthracite Woodgrain
(PMMPD535N)
£96.26 £107.30

Save £11.04 when purchased with the main item

In Stock
Nuie Square Shower Bath End Panel 520mm H x 680mm W - Anthracite Woodgrain
(PMMPD531N)
£50.44 £60.75

Save £10.31 when purchased with the main item

In Stock

Required Bath Clips

Nuie Bath Panel Clips
(PMBPC001)
£12.11
In Stock

Suitable Bath Screen

Nuie Pacific Chrome L-Shaped Hinged Bath Screen 1430mm H x 795mm W - 6mm Glass
(PMNSBS7)
£102.80 £113.95

Save £11.15 when purchased with the main item

In Stock
Nuie Ella Bath Screen with Hinged End Panel 1400mm H x 760mm W - 5mm Glass
(PMERSBS0)
£114.96 £126.30

Save £11.34 when purchased with the main item

In Stock

Write a review

Recently Viewed Products

Products from your recent browsing history

April Stone Resin 45mm Rectangular Shower Tray | Product Image

April Stone Resin 45mm Rectangular Shower Tray

From
£138.95
In Stock
3 Days
(3)
Nuie Square L-Shaped Shower Bath 1700mm x 700mm/850mm - Left Handed (inc Leg Set) | Product Image
PRICE DROP
Nuie Slimline Black Slate Effect Square Shower Tray 900mm x 900mm | Product Image
PRICE DROP
Nuie Slimline Black Slate Effect Rectangular Shower Tray 1200mm x 900mm | Product Image
PRICE DROP
AKW Origins Arctic Shimmer 11mm WBP Shower Wall Panel | Product Image

Related Categories

Find similar products by visiting these categories

Product Lines

Choose from more than 30,000 products

Free Delivery

We deliver all orders FREE to 98% of UK mainland locations

TRADE ACCOUNT

Apply today
Log in on any device
Pick what you want
See trade discount
Call us or shop online
Get priority shipping