Nuie L-Shaped Shower Bath Front Panel 500mm H x 1700mm W (2 Piece) - Acrylic | Product Image Nuie L-Shaped Shower Bath Front Panel 500mm H x 1700mm W (2 Piece) - Acrylic | Product Image Nuie L-Shaped Shower Bath Front Panel 500mm H x 1700mm W (2 Piece) - Acrylic  | Dimension Image
Nuie L-Shaped Shower Bath Front Panel 500mm H x 1700mm W (2 Piece) - Acrylic | Thumbnail Image Nuie L-Shaped Shower Bath Front Panel 500mm H x 1700mm W (2 Piece) - Acrylic | Thumbnail Image Nuie L-Shaped Shower Bath Front Panel 500mm H x 1700mm W (2 Piece) - Acrylic

Nuie L-Shaped Shower Bath Front Panel 500mm H x 1700mm W (2 Piece) - Acrylic

Quick Code: 2812964
Ref: PMWBS300N
Nuie | Brand Logo
£68.95 Inc. VAT

Special offer - available at a new lower price for a limited time

Was: £

In Stock

Usually delivered within 3 working days

Free Delivery Available

Delivery postcode restrictions apply

Check

Having a bath in your home means that you can ensure that every single member of your family and stay clean and hygienic. However, when it comes to installing a bath, you are going to need to ensure that it is finished in a way that looks stylish.

A great way to do this is with a bath panel. As bathroom industry experts, Nuie have developed the ideal finishing touches to your bathroom space, which ensures that this much needed and used space in your home is exactly what you need it to be.

One example of this is their Nuie L Shaped Bath Panel WBS300N. Designed to be used with L shaped shower baths, it is incredibly easy to install and looks beautiful when it is added to your bathroom.

Crafted and finished in a high gloss white acrylic, the bath panel is built to the highest standards in the industry and comes complete with a 5 year guarantee that is direct from the manufacturer.

Product Features

  • High gloss white Acrylic panel
  • Comes with 2 piece
  • Manufactured to the highest standards
  • For use with L shaped nuie shower baths
  • Extremely easy and simple installation
  • Supplied with a 5 year guarantee from the manufacturer, please see manufacturer guarantee policy for more information

Important Information

  • Bath End Panel sold separately (See the You May Need)
  • These panels is only suitable for Nuie L shaped and is NOT universal

Bath Panel TypeFront Panel
Bath Panel Width1695mm
Bath Panel Height500mm
MaterialAcrylic
ColourWhite
BrandNuie
StyleModern
MarketDomestic
EAN Barcode5056211883753
Manufacturer Part Number(s)WBS300N

Brochure-26
Type : PDF Size : 47.60 MB
Fitting Instructions
Type : PDF Size : 146.79 KB
Panel Fixing Clip Instructions
Type : PDF Size : 222.96 KB
Guarantee Policy
Type : PDF Size : 319.11 KB

Suitable Bath End Panel

Nuie Acrylic Square Bath End Panel 500mm H x 700mm W - White
(PMWBS301)
£59.95 £69.95

Save £10.00 when purchased with the main item

In Stock

Suitable Bath Clips

Nuie Bath Panel Clips
(PMBPC001)
£12.95
In Stock

Write a review

Recently Viewed Products

Products from your recent browsing history

Related Categories

Find similar products by visiting these categories

Product Lines

Choose from more than 30,000 products

Free Delivery

We deliver all orders FREE to 98% of UK mainland locations

TRADE ACCOUNT

Apply today
Log in on any device
Pick what you want
See trade discount
Call us or shop online
Get priority shipping