Towel Rail Sale
Hurry Offer Ends In
06 Days
:
07 Hours
:
20 Mins
:
39 Secs
Sagittarius Centre Push Basin Waste Chrome - Unslotted (For Basins with No Overflow) | Product Image Sagittarius Centre Push Basin Waste Chrome - Unslotted (For Basins with No Overflow)  | Dimension Image
Sagittarius Centre Push Basin Waste Chrome - Unslotted (For Basins with No Overflow) | Thumbnail Image Sagittarius Centre Push Basin Waste Chrome - Unslotted (For Basins with No Overflow)

Sagittarius Centre Push Basin Waste Chrome - Unslotted (For Basins with No Overflow)

Quick Code: 2677601
Ref: SAGWBS405C
Sagittarius | Brand Logo
£40.95 Inc. VAT

Special offer - available at a new lower price for a limited time

Was: £

In Stock

Usually delivered within 2 working days

Free Delivery Available

Delivery postcode restrictions apply

Check

The Sagittarius Centre Push Basin Waste Chrome - Unslotted (For Basins with no overflow) is a model from the range of bathroom accessories by sagittarius who provides the high quality modern and traditional bathroom products in the UK. A wastes are designed to allow the water in the bath/basin to run away, and also can be used to block the pipes to fill up the basin with water. The push button basin wastes are the popular option that are operated by simply pushing down on the central button which allows the sink to fill, and then pushing again to open for draining.

Product Features

  • Manufactured to the highest standards
  • Comes in chrome finish
  • Press top mechanism
  • Easy to install
  • Simple to use, create a sleek, minimal look
  • Suitable for basins without overflow
  • Manufactured to comply with WRAS
  • Supplied with 3 year guarantee from manufacturer

Waste Height79mm
Waste Width68mm
TypeClick Clack
FinishChrome
StyleModern
EAN Barcode503481405900
Manufacturer Part NumberWBS/405/C

Product Datasheet
Type : PDF Size : 172.25 KB
Guarantee Overview
Type : PDF Size : 379.16 KB
Terms and Warranty
Type : PDF Size : 211.32 KB

Write a review

Recently Viewed Products

Products from your recent browsing history

Related Categories

Find similar products by visiting these categories

Product Lines

Choose from more than 30,000 products

Free Delivery

We deliver all orders FREE to 98% of UK mainland locations

TRADE ACCOUNT

Apply today
Log in on any device
Pick what you want
See trade discount
Call us or shop online
Get priority shipping