Nuie L-Shaped Shower Bath Front Panel 500mm H x 1500mm W - Acrylic | Product Image Nuie L-Shaped Shower Bath Front Panel 500mm H x 1500mm W - Acrylic | Product Image Nuie L-Shaped Shower Bath Front Panel 500mm H x 1500mm W - Acrylic  | Dimension Image
Nuie L-Shaped Shower Bath Front Panel 500mm H x 1500mm W - Acrylic | Thumbnail Image Nuie L-Shaped Shower Bath Front Panel 500mm H x 1500mm W - Acrylic | Thumbnail Image Nuie L-Shaped Shower Bath Front Panel 500mm H x 1500mm W - Acrylic

Nuie L-Shaped Shower Bath Front Panel 500mm H x 1500mm W - Acrylic

Quick Code: 2812961
Ref: PMWBS302
Nuie | Brand Logo
£81.95 Inc. VAT

Special offer - available at a new lower price for a limited time

Was: £

PayPal Credit

In Stock

Usually delivered within 3 working days

Free Delivery Available

Delivery postcode restrictions apply

Check

Product Features

  • High gloss white Acrylic panel
  • Manufactured to the highest standards
  • For use with L shaped nuie shower baths
  • Extremely easy and simple installation
  • Supplied with a 5 year guarantee from the manufacturer, please see manufacturer guarantee policy for more information

Important Information

  • Bath End Panel sold separately (See the You May Need)
  • These panels is only suitable for Nuie L shaped and is NOT universal

Bath Panel TypeFront Panel
Bath Panel Width1495mm
Bath Panel Height500mm
MaterialAcrylic
ColourWhite
BrandNuie
StyleModern
MarketDomestic
Weightt2.8Kg
EAN Barcode5055275824528
Manufacturer Part Number(s)WBS302

Guarantee Policy
Type : PDF Size : 319.11 KB
Product Datasheet
Type : PDF Size : 3.35 MB
Brochure-26
Type : PDF Size : 43.73 MB
Fitting Instructions
Type : PDF Size : 146.79 KB
Panel Fixing Clip Instructions
Type : PDF Size : 222.96 KB

Suitable Bath End Panel

Nuie Acrylic Square Bath End Panel 500mm H x 700mm W - White
(PMWBS301)
£59.95 £69.95

Save £10.00 when purchased with the main item

In Stock

Suitable Bath Clips

Nuie Bath Panel Clips
(PMBPC001)
£12.95
In Stock

Write a review

Recently Viewed Products

Products from your recent browsing history

Related Categories

Find similar products by visiting these categories

Product Lines

Choose from more than 30,000 products

Free Delivery

We deliver all orders FREE to 98% of UK mainland locations

TRADE ACCOUNT

Apply today
Log in on any device
Pick what you want
See trade discount
Call us or shop online
Get priority shipping