Nuie Cove L-Shaped Shower Bath Hinged Screen 1700mm x 700mm/850mm - Left Handed (inc Leg Set) | Product Image Nuie Cove L-Shaped Shower Bath Hinged Screen 1700mm x 700mm/850mm - Left Handed (inc Leg Set) | Product Image Nuie Cove L-Shaped Shower Bath Hinged Screen 1700mm x 700mm/850mm - Left Handed (inc Leg Set) | Product Image Nuie Cove L-Shaped Shower Bath Hinged Screen 1700mm x 700mm/850mm - Left Handed (inc Leg Set) | Product Image Nuie Cove L-Shaped Shower Bath Hinged Screen 1700mm x 700mm/850mm - Left Handed (inc Leg Set) | Product Image Nuie Cove L-Shaped Shower Bath Hinged Screen 1700mm x 700mm/850mm - Left Handed (inc Leg Set) | Product Image Nuie Cove L-Shaped Shower Bath Hinged Screen 1700mm x 700mm/850mm - Left Handed (inc Leg Set) | Product Image Nuie Cove L-Shaped Shower Bath Hinged Screen 1700mm x 700mm/850mm - Left Handed (inc Leg Set)  | Dimension Image
Nuie Cove L-Shaped Shower Bath Hinged Screen 1700mm x 700mm/850mm - Left Handed (inc Leg Set) | Thumbnail Image Nuie Cove L-Shaped Shower Bath Hinged Screen 1700mm x 700mm/850mm - Left Handed (inc Leg Set) | Thumbnail Image Nuie Cove L-Shaped Shower Bath Hinged Screen 1700mm x 700mm/850mm - Left Handed (inc Leg Set) | Thumbnail Image Nuie Cove L-Shaped Shower Bath Hinged Screen 1700mm x 700mm/850mm - Left Handed (inc Leg Set) | Thumbnail Image Nuie Cove L-Shaped Shower Bath Hinged Screen 1700mm x 700mm/850mm - Left Handed (inc Leg Set) | Thumbnail Image Nuie Cove L-Shaped Shower Bath Hinged Screen 1700mm x 700mm/850mm - Left Handed (inc Leg Set) | Thumbnail Image Nuie Cove L-Shaped Shower Bath Hinged Screen 1700mm x 700mm/850mm - Left Handed (inc Leg Set) | Thumbnail Image Nuie Cove L-Shaped Shower Bath Hinged Screen 1700mm x 700mm/850mm - Left Handed (inc Leg Set)

Nuie Cove L-Shaped Shower Bath Hinged Screen 1700mm x 700mm/850mm - Left Handed (inc Leg Set)

Quick Code: 2780970
Ref: PMPK209
Nuie | Brand Logo
£465.95 Inc. VAT

Special offer - available at a new lower price for a limited time

Was: £

PayPal Credit
Spread the cost with 12 monthly payments of £38.83 at 0% APR using PayPal.
Find out more

Bath Type:

Bathtub OnlyBath & Screen Bundle
Bath & Hinged Screen Bundle

Bath Size:

Showering End:

In Stock

Usually delivered within 3 working days

Free Delivery Available

Delivery postcode restrictions apply

Check

Nuie L-Shaped Premium Complete Shower Bath Package - 1700mm x 850mm - Left Handed

The L-Bath is a square, space-saving shower bath with a dedicated showering area. The sturdy and hardwearing bath is popular in contemporary settings, blending particularly well with bathroom furniture. The maximum footprint of this L-shaped bath extends to 850mm wide for the showering section, and just 700mm for the bath end.

This premium L-Bath set comes as a complete package including an 18mm thick MDF front bath panel and a 6mm double hinged L-shaped shower screen.

Product Features

  • 1700mm x 850mm L-shaped square shower bath with showering and bathing ends
  • Left handed model - the showering area is on the left hand side when viewed from the front
  • Bathtub comes complete with leg set required for installation
  • Includes premium 18mm thick MDF bath front panel finished in gloss white
  • Includes 6mm double hinged L-shaped screen measuring 1400mm (H) x 800mm (W)
  • 700mm wide at bath end; 850mm maximum width at showering end
  • Manufactured from 4mm thick acrylic
  • Bath finish: European White; Front Panel finish: Gloss White
  • Single ended design - waste and overflow positioned at the showering end of the bath
  • Supplied with no pre-drilled tap holes - allowing more flexibility when choosing taps/fillers
  • 5 year guarantee supplied by the manufacturer (see Guarantee Policy for more information)

Important Information

  • Complete package with bathtub, leg set, MDF front panel and NSBS3 bath screen
  • Bath end panel, bath waste and taps sold separately
  • All product images show a 1700mm x 700mm/850mm model

Bath TypeShower Bath
Bath ShapeL-Shaped
ConfigurationSingle Ended
Bath ReinforcementStandard
Bath Length1700mm
Bath Width700-850mm
Bath Height400mm
Bath Total Height540mm
Bath Internal Length1175mm
Bath Internal Width469mm
Bath Thickness4mm
Capacity235 Litres
HandedLeft Handed
Waste PositionEnd
Bath FeaturesIncludes Legs
MaterialAcrylic
ColourWhite
StyleModern
MarketDomestic
Bath Screen TypeHinged
Bath Panel Included?No
BrandNuie
CollectionCove
EAN Barcode5055369032433
Manufacturer Part Number(s)NMP135+NSBS3+WBS1785L

Brochure-26
Type : PDF Size : 47.60 MB
Fitting Instruction
Type : PDF Size : 150.67 KB
Bath screen Fitting Instruction
Type : PDF Size : 402.75 KB
Bath Instruction
Type : PDF Size : 165.75 KB
Guarantee Policy
Type : PDF Size : 319.11 KB
Bath Datasheet
Type : PDF Size : 3.27 MB
Bath Screen Datasheet
Type : PDF Size : 1.02 MB
Bath Front Panel Datasheet
Type : PDF Size : 1.04 MB

Required Bath Waste

Nuie Bath Pop Up Waste with Minimalist Overflow - Chrome
(HAE357)
£24.95 £32.95

Save £8.00 when purchased with the main item

In Stock
Nuie Easy-Clean Press Top Bath Waste with Minimalist Overflow - Chrome
(HAE327)
£27.95 £33.95

Save £6.00 when purchased with the main item

In Stock

Required Bath Panels

Nuie L-Shaped End Bath Panel 540mm H x 700mm W - Gloss White
(PMNMP131)
£51.95
In Stock

Write a review

Recently Viewed Products

Products from your recent browsing history

Related Categories

Find similar products by visiting these categories

Product Lines

Choose from more than 30,000 products

Free Delivery

We deliver all orders FREE to 98% of UK mainland locations

TRADE ACCOUNT

Apply today
Log in on any device
Pick what you want
See trade discount
Call us or shop online
Get priority shipping